This specifi c design complied with all mandated nuclear and regulatory codes and standards including, but not limited to,
NUREG-0554, NUREG-0612, ASME NOG-1 and 10 CFR 50, Appendix B. Related activities included structural analysis of crane
runway and building structure, including identifi cation of required building modifi cations to accommodate the increased
loadings imposed on the building as a result of the crane upgrade.