Contact Us Request a Quote
Contact Us

Containment buildings aren’t designed for convenience. They’re designed for safety, redundancy, and control. During nuclear refueling and maintenance outages, that reality creates a familiar challenge: core components must be lifted, positioned, and removed in spaces where access is limited and conditions are constantly changing.

That’s where a telescopic outage jib crane becomes an essential part of outage planning.

A lifting solution built for constrained environments

A jib crane uses a horizontal boom to lift and position loads within a defined work area, often with full 360-degree rotation. A telescopic outage jib crane adds another layer of flexibility by allowing the boom to extend and retract as needed. Instead of working around a fixed radius, operators can adjust the reach to match the task—bringing the hook closer for precise control or extending outward to access equipment deeper within containment.

In nuclear plants, this adaptability is especially valuable. During outages, work zones shift quickly as scaffolding, shielding, tooling, and personnel move in and out. A telescoping boom allows crews to adapt without constant crane repositioning or re-rigging, helping maintain momentum as outage activities progress.

Designed specifically for outage work

Telescopic outage jib cranes are not general-purpose lifting devices. They are engineered with outage workflows in mind—where speed, reliability, and repeatability are necessary. Features such as smooth rotation, controlled load handling, and modular or temporary installation options allow these cranes to be deployed where they’re needed most, without interfering with adjacent work.

For nuclear applications, quality requirements are non-negotiable. Telescopic outage jib cranes supplied for this environment are typically manufactured, tested, and documented in accordance with stringent nuclear quality programs, including 10 CFR 50 Appendix B requirements when specified. This ensures not only safe operation, but also confidence in compliance and traceability throughout the outage.

Improving efficiency without compromising safety

One of the most significant advantages of a telescopic outage jib crane is its impact on outage efficiency. By reducing the need to relocate equipment or adjust lift plans, these cranes help minimize downtime between tasks. Loads can be handled closer to the point of use, reducing congestion and improving coordination among multiple work crews operating simultaneously.

At the same time, adjustable reach and controlled movement contribute to safer lifts. Operators maintain better visibility and control, particularly in tight spaces where precision matters most. The result is a lifting solution that supports both productivity and safety—two priorities that must always work together in nuclear environments.

A practical tool for outage success

A telescopic outage jib crane is more than a convenience—it’s a strategic asset. By aligning lifting capability with the physical realities of containment structures, it helps nuclear plants execute outages more smoothly, predictably, and safely.

Curious whether a telescopic outage jib crane is the right fit for your outage? Our team is happy to talk it through!